Friday, June 29, 2012

Pre Refit Pictures

Removed the old mildew stained bolsters. The plywood backing was also rotten. Estimating costs to have the holes filled and new gelcoat costs compared to replacing with new bolsters...

 Removed the teak railings. Estimating costs to have the holes filled and new gelcoat costs compared to replacing with new railings - either sand & varnish or replace with PlasTeak...
 Pulled out the old blue carpet.  Replace with new lighter carpet or a "Teak & Holley" carpet for $1,000?
Pulling out the old hot water tank, installing new Isotherm unit, new water pump and tank, cleaning up the area, repainting prior to re-installing.
Pulling out the old HEAVY house battery and both the head tank and water tank, installing new head system, new water tank(s), cleaning up the area, repainting prior to re-installing everything.